Skip to product information
1 of 9

Vesgantti

Vesgantti Twin XL Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 39"*80"*10"

Vesgantti Twin XL Mattress 10 Inch, Fiberglass-Free | Cool Sleep Hybrid Mattress in a Box - Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 39"*80"*10"

Regular price $318.99 USD
Regular price Sale price $318.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Vesgantti Luxury Support System: Memory foam and pocket spring support system also provide more buffers for your body, help relieve back pain, greatly improve your sleeping quality
  • Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, fiberglass-free, cooling, breathable and comfortable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base. Please note: once the mattress open and restore, it cannot be roll back again

Overview

  • Brand : Vesgantti
  • Size : Twin XL
  • Product Dimensions : 80"L x 39"W x 10"Th
  • Item Weight : 50 Pounds
  • Item Firmness Description : Medium
  • Top Style : Euro Top
  • Cover Material : knitted fabric
  • Number of Layers : 5
  • Fill Material : Memory Foam
  • Special Feature : Orthopedic, Pressure Relief, Breathable, Low Motion Transfer, Cooling
View full details

What Our Customers Say

Real reviews from real customers

S

Sarah M.

Verified

The quality of the bedroom furniture exceeded my expectations. The mattress is incredibly comfortable and has improved my sleep quality significantly.

May 15, 2026
J

James K.

Verified

Absolutely love my new bed frame! It's sturdy, elegant, and fits perfectly in my bedroom. The delivery was fast and assembly was straightforward.

May 10, 2026
E

Emily R.

Verified

The pillows are a game changer! They provide the perfect support and I wake up without any neck pain. Highly recommend Soft Frame products.

May 8, 2026
M

Michael T.

Verified

Outstanding customer service and premium quality furniture. The nightstand is beautifully crafted and adds a touch of elegance to my bedroom.

May 5, 2026

Soft Frame


“From restful sleep to everyday living, every detail matters—explore, discover, and transform your bedroom into a space of comfort.”

over view

Frequently Asked Questions

Our products are crafted with love and attention to detail, ensuring the highest quality for our customers.

We typically ship within 2–3 business days, and delivery usually takes 3–8 business days depending on your location. Some products may take longer to arrive. If there are any delays, we will notify you by email.

We offer a 30-day return policy for all unused items in their original packaging. Customer satisfaction is our priority!

We currently ship within the United States only. Unfortunately, we are unable to ship to other countries at this time.